We were contracted by the Weitz Company to install this 24,000 lb solid stone bowl at the CityScape courtyard project – The piece was 8′ out of reach of the site crane for the setting site, we were faced with a dilemma on how to get this very heavy piece installed, when we talked through the process with the crane operator it was determined that the crane boom would “bend” just enough to place the heavy piece – when the crane released the piece the boom shook latterly for 3 minutes!